Skip to content

Port 1.0-staging to main #4345

Port 1.0-staging to main

Port 1.0-staging to main #4345

Triggered via pull request October 11, 2024 16:57
Status Failure
Total duration 10m 3s
Artifacts

main.yml

on: pull_request
Matrix: Check
Matrix: Check nightly-only targets
Matrix: Check --no-default-features
Matrix: Check selected Tier 3 platforms
Matrix: Test
Matrix: Test rustix_use_experimental_asm
Matrix: Test use-libc
Fit to window
Zoom out
Zoom in

Annotations

9 errors and 1 warning
Test use-libc (arm-linux)
Process completed with exit code 101.
Test use-libc (aarch64-linux)
The job was canceled because "arm-linux" failed.
Test use-libc (i686-linux)
The job was canceled because "arm-linux" failed.
Test use-libc (i686-linux)
The operation was canceled.
Test use-libc (powerpc64le-linux)
The job was canceled because "arm-linux" failed.
Test use-libc (powerpc64le-linux)
The operation was canceled.
Test use-libc (riscv64-linux)
The job was canceled because "arm-linux" failed.
Test use-libc (riscv64-linux)
The operation was canceled.
Check selected Tier 3 platforms (nightly)
Process completed with exit code 101.
Test (macos-12)
A brownout will take place on November 4, 14:00 UTC - November 5, 00:00 UTC to raise awareness of the upcoming macOS-12 environment removal. For more details, see https:/actions/runner-images/issues/10721