Error notifications despite the resource being successfully reconciled #3480
Comments
This repo is for Flux v1, which is in maintenance mode. I think you are looking for https:/fluxcd/notification-controller or perhaps Flux v2 discussions, Q&A: https:/fluxcd/flux2/discussions/categories/q-a I'm not sure there is enough to open an issue (instructions to reproduce are not especially clear) but you may get some clarity from one of the maintainers by asking about this in the Q&A section. I think you have understood the issue, it looks like what you expected: this notification means that a reconciliation was triggered while one was already in progress, which maybe is only an important error if it happens more than a few times in a row. I suspect this is an https://fluxcd.io/docs/components/notification/alert/ You can configure the alert with an ExclusionList, if this message is not ever important then you can always exclude it. Maybe that's enough to resolve this for you? I'm not sure what else to suggest, flux alerts are only based on the parameters that you configure. Hope this information is helpful! |
Thanks for your detailed answer, I know I can just make a custom rule to remove this error from even showing up but it seems wrong that this is an error as everything went well in the end. I thought I'd just let the maintainer know of this behavior and if no fix is possible I will ignore it. |
Describe the bug
Flux sends out error level notifications despite the resource being successfully reconciled.
This is the discord notification I received, in that order:
And when I checked later:
All of this happened in a 2 minutes time window between the start of the reconciliation and the error notification.
To Reproduce
Hard to tell. No manual intervention was made besides updating the docker image in the values of the chart on the gitops repository, all those resources are managed by flux. Last time jellyfin was reconciled it worked fine. A week ago grafana reconciliation had the same error but not after so it does not seem to be related to a helm chart in particular.
My guess is that there is a conflict because flux tries to run two reconciliations at the same time of the same resource.
Expected behavior
Error notifications sent when reconciliation actually fails, maybe for a longer period of time? At least make this maybe a warning level on first occurrence.
I am not sure what should be done, but throwing an error seems wrong.
Logs
N/A